Warrigal Haul Rd Construction
This project involved the construction and seal of 7km of bitumen haul road. The road was constructed in challenging terrain with several large creek crossings and including tie-ins with existing haul roads, requiring interface with heavy haulage traffic.
The scope of works comprised clearing, grubbing and stripping of topsoil; earthworks; borrow pit management and rehabilitation; pavement construction (subgrade, subbase and basecourse placement); drainage including culvert and floodway installation; and traffic management.
Client
|
BC Iron Limited
|
Division
|
Civil
|
Commenced
|
Apr 2012
|
Duration - Months
|
5
|
Location
|
Nullagine, WA
|