This project involved the construction and seal of 7km of bitumen haul road.  The road was constructed in challenging terrain with several large creek crossings and including tie-ins with existing haul roads, requiring interface with heavy haulage traffic. 

The scope of works comprised clearing, grubbing and stripping of topsoil; earthworks; borrow pit management and rehabilitation; pavement construction (subgrade, subbase and basecourse placement); drainage including culvert and floodway installation; and traffic management.